三级网看小美女I97韩国电影I久久伊人操I国产91学生I亚洲成色777777在线观看影院I欧美俄罗斯性视频I波多野结衣久久久I欧美日韩国产免费视频I国产精品久久久久9999吃药

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Space Environment Test Module

  • Hot Line:18322499311

Space Environment Test Mo

        

1、 The purpose and characteristics of the equipment:


Used for conducting thermal balance tests and thermal vacuum tests on various space equipment.




2. Basic requirements

3. Manufacturers of space environment testing equipment have High design and manufacturing capabilities and are well-known domestic brands;

4. Meet the standards:

QJ 20127 Technical Requirements for Spacecraft Space Thermal Environment Test Equipment;

GJB 1033 Spacecraft Thermal Balance Test Method;

Test requirements for GJB 1027 carrier, upper stage, and spacecraft;

GJB 2209 Specification for Geosynchronous Orbit Satellite Transponder;

GJB 2042 Satellite Power System Specification;

QJ 1446 Satellite Thermal Vacuum Test Method.

5. Excellent after-sales service and quality assurance should be provided, and the entire machine is guaranteed for 3 years from the date of acceptance.


This equipment is mainly used for high and low temperature tests and low-pressure discharge tests under high vacuum conditions, and can also be used as a simulation test equipment for other small components in orbit.


6. This technical solution is developed based on the technical requirements of the central thermal vacuum testing equipment (mechanical refrigeration). This technical solution is one of the basis for designing and manufacturing the equipment. This equipment includes five aspects: thermal vacuum simulation container, vacuum protection system, high and low temperature protection system, thermal vacuum state control and display system, and auxiliary supporting system. The equipment developed based on this technical solution can truly simulate the cold and hot environment of a vacuum space, and can effectively control, monitor, and record the vacuum degree and temperature of the space. The device has the following characteristics.


7. The entire equipment vacuum system adopts a low-temperature pump as the main pump, with a screw dry pump as the front stage and pre pumping pump, which can achieve the required working vacuum degree for oil-free testing; In terms of temperature control, mechanical refrigeration is used to obtain a low-temperature background, and advanced intelligent PID temperature controllers are used to control the heating current of the heating cage, thereby accurately controlling the temperature; The acquisition of low temperature adopts a unique mechanical refrigeration technology, which eliminates the cost of using liquid nitrogen refrigeration. The control system adopts a combination of industrial computer and PLC for joint control. The display interface of the industrial computer is clear and easy to understand, the PLC control is accurate and reliable, and the fault diagnosis is simple. In addition, different temperature curve formulas can be made according to the user's process requirements, stored in the industrial computer, and available for users to choose and call during the experiment, making it easy for users to master when conducting experimental operations. In summary, this equipment has high vacuum degree, easy temperature control and good uniformity, stable and reliable long-term operation, and can work continuously for more than 30 days. It is easy and convenient to operate and use. This device has certain specificity and universality, and is an essential equipment for space environment simulation experiments.


2、 Components of Equipment Design


1. Vacuum simulation container (vacuum chamber and internal support)

2. Vacuum protection system (vacuum pump, valve, pipeline, and vacuum measurement)

3. Temperature guarantee system:

Low temperature refrigeration system: (regional temperature control refrigeration unit+liquid nitrogen refrigeration, heat sink, low-temperature valve and connecting pipe)

Heating and temperature control system: (heating cage, heating power supply), heating cage, vacuum sealed heating electrode, transformer, voltage regulating module, temperature control box

4. Control and monitoring system (cabinet, industrial computer, PLC).

5. Auxiliary supporting systems (air pump, cooling circulating water machine, pollution monitoring)

3、 Main technical indicators of equipment system (excerpt)

Vacuum degree parameter


1. Internal dimensions of the main heat sink: φ 2m * 4m (length)

2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;

3. The total power consumption of the equipment is expected to be 120kw/380V

Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67

4. Temperature control platform: Thermal oil process;

5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃

6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);

7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);

8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)

9. Vacuum degree time<4h

10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m&sup3/ s;

When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping


The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes


Test piece temperature


13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used

It is recommended to use mechanical refrigeration, which can save a lot of operating costs.

14. Temperature display accuracy: 0.1 ℃;

15. Temperature fluctuation: ≤ ±1℃;

16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃

Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;


Heat sink index (bottom plate index)

1. Gas nitrogen process (external heat flow):

Heat sink heating and cooling rate ≥ 1 ℃/min

Temperature range of the inner surface of the heat sink:- 150~+160℃

Uniformity of heat sink temperature: ± 2 ℃

Temperature control precision of temperature control base plate: ± 0.5 ℃

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).

Temperature controlled base plate

1. Temperature control process of thermal oil:


Effective temperature control zone: 1.0X1.2m2 x 2

Temperature range of temperature control base plate:- 75℃~+130℃;

Temperature uniformity of temperature control base plate: ± 2 ℃;

Temperature control precision of temperature control base plate: ± 0.5 ℃


Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;


After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than 30 minutes;


The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).


Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;


3、 Main technical indicators of equipment system (excerpt)


Vacuum degree parameter


1. Internal dimensions of the main heat sink: φ 2m * 4m (length)


2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;


3. The total power consumption of the equipment is expected to be 120kw/380V


Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67


4. Temperature control platform: Thermal oil process;


5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃


6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);


7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);


8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)


9. Vacuum degree time<4h


10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m&sup3/ s;


When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping


The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes


Test piece temperature


13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used


It is recommended to use mechanical refrigeration, which can save a lot of operating costs.


14. Temperature display accuracy: 0.1 ℃;


15. Temperature fluctuation: ≤ ±1℃;


16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃


Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;


Heat sink index (bottom plate index)


1. Gas nitrogen process (external heat flow):


Heat sink heating and cooling rate ≥ 1 ℃/min


Temperature range of the inner surface of the heat sink:- 150~+160℃


Uniformity of heat sink temperature: ± 2 ℃


Temperature control precision of temperature control base plate: ± 0.5 ℃


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).


Temperature controlled base plate


1. Temperature control process of thermal oil:


Effective temperature control zone: 1.0X1.2m2 x 2


Temperature range of temperature control base plate:- 75℃~+130℃;


Temperature uniformity of temperature control base plate: ± 2 ℃;


Temperature control precision of temperature control base plate: ± 0.5 ℃


Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;


After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than 30 minutes;


The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).


Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;


4、 Structure section


1. The test chamber container is designed as a vacuum container and has a horizontal circular cylindrical structure. It is supported by a support frame at the bottom, which directly lands on the ground


2. The vacuum chamber adopts a horizontal stainless steel vacuum container (made of SUS304 stainless steel, with a thickness of 16mm), and the inner side is


Mirror polishing, white spray coating on the outside; The vacuum chamber is equipped with low-pressure lighting, with a brightness of not less than 200 lumens. Vacuum chamber with built-in cargo platform


The platform.


Configure the track inside the tank, and set two parallel guide rails inside the heat sink. The top height of the guide rails is about 60cm below the centerline of the heat sink (safe installation will be carried out in the later stage of development, and the guide rail design will be confirmed by the demand side). The guide rail can bear a load of ≥ 3 tons.


Configure the lifting and unloading vehicle to complete the installation and docking between the test piece (about 3 tons) and the guide rail,


Install separate guide rails and a temperature control platform for each zone. The temperature control platform can be removed or does not affect the entry and exit of the 3-ton test piece.


Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser


Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser


Observation window size: φ300mm, Install one at the center position of the front head of the vacuum container (or according to customer requirements), and install one on one side of the tank perpendicular to the axis direction of the tank to facilitate observation of the situation inside the container during the test


Special aerospace black paint is sprayed on the surface, with a solar absorption coefficient of ≥ 0.90 and a hemispherical emissivity of ≥ 0.90, and it does not peel off within the temperature range of 100K to 150 ℃.


Through holes should be reserved on the cold plate; The loading platform has a pull-out function and can be used for assembling test pieces outside of cabin 54. The vacuum container is a horizontal cylindrical shape;


The vacuum container and internal structural materials are made of 0Gr18Ni9 stainless steel, the external structural components are made of carbon steel, and the outside of the container is treated with spray paint;


The inner wall of the vacuum container is polished (0.8um), and 8 necessary flange holes are opened on the wall (4 on each side), including the inlet and outlet interfaces of the nitrogen packaging system, vacuum pumping interface, vacuum gauge interface, temperature measurement and control interface, inflation interface, and other flanges.


1、 The purpose and characteristics of the equipment:


1. Used for conducting thermal balance tests and thermal vacuum tests on various space equipment.


2. Basic requirements


3. Manufacturers of space environment testing equipment have high design and manufacturing capabilities and are well-known domestic brands;


4. Meet the standards:


QJ 20127 Technical Requirements for Spacecraft Space Thermal Environment Test Equipment;


GJB 1033 Spacecraft Thermal Balance Test Method;


Test requirements for GJB 1027 carrier, upper stage, and spacecraft;


GJB 2209 Specification for Geosynchronous Orbit Satellite Transponder;


GJB 2042 Satellite Power System Specification;


QJ 1446 Satellite Thermal Vacuum Test Method.


5. Excellent after-sales service and quality assurance should be provided, and the entire machine is guaranteed for 3 years from the date of acceptance.


This equipment is mainly used for high and low temperature tests and low-pressure discharge tests under high vacuum conditions, and can also be used as a simulation test equipment for other small components in orbit.


6. This technical solution is developed based on the technical requirements of the central thermal vacuum testing equipment (mechanical refrigeration). This technical solution is one of the basis for designing and manufacturing the equipment. This equipment includes five aspects: thermal vacuum simulation container, vacuum protection system, high and low temperature protection system, thermal vacuum state control and display system, and auxiliary supporting system. The equipment developed based on this technical solution can truly simulate the cold and hot environment of a vacuum space, and can effectively control, monitor, and record the vacuum degree and temperature of the space. The device has the following characteristics.


7. The entire equipment vacuum system adopts a low-temperature pump as the main pump, with a screw dry pump as the front stage and pre pumping pump, which can achieve the required working vacuum degree for oil-free testing; In terms of temperature control, mechanical refrigeration is used to obtain a low-temperature background, and advanced intelligent PID temperature controllers are used to control the heating current of the heating cage, thereby accurately controlling the temperature; The acquisition of low temperature adopts a unique mechanical refrigeration technology, which eliminates the cost of using liquid nitrogen refrigeration. The control system adopts a combination of industrial computer and PLC for joint control. The display interface of the industrial computer is clear and easy to understand, the PLC control is accurate and reliable, and the fault diagnosis is simple. In addition, different temperature curve formulas can be made according to the user's process requirements, stored in the industrial computer, and available for users to choose and call during the experiment, making it easy for users to master when conducting experimental operations. In summary, this equipment has high vacuum degree, easy temperature control and good uniformity, stable and reliable long-term operation, and can work continuously for more than 30 days. It is easy and convenient to operate and use. This device has certain specificity and universality, and is an essential equipment for space environment simulation experiments.


2、 Components of Equipment Design


1. Vacuum simulation container (vacuum chamber and internal support)


2. Vacuum protection system (vacuum pump, valve, pipeline, and vacuum measurement)


3. Temperature guarantee system:


Low temperature refrigeration system: (regional temperature control refrigeration unit+liquid nitrogen refrigeration, heat sink, low-temperature valve and connecting pipe)


Heating and temperature control system: (heating cage, heating power supply), heating cage, vacuum sealed heating electrode, transformer, voltage regulating module, temperature control box


4. Control and monitoring system (cabinet, industrial computer, PLC).


5. Auxiliary supporting systems (air pump, cooling circulating water machine, pollution monitoring)


3、 Main technical indicators of equipment system (excerpt)


Vacuum degree parameter


1. Internal dimensions of the main heat sink: φ 2m * 4m (length)


2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;


3. The total power consumption of the equipment is expected to be 120kw/380V


Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67


4. Temperature control platform: Thermal oil process;


5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃


6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);


7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);


8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)


9. Vacuum degree time<4h


10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m&sup3/ s;


When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping


The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes


Test piece temperature


13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used


It is recommended to use mechanical refrigeration, which can save a lot of operating costs.


14. Temperature display accuracy: 0.1 ℃;


15. Temperature fluctuation: ≤ ±1℃;


16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃


Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;


Heat sink index (bottom plate index)


1. Gas nitrogen process (external heat flow):


Heat sink heating and cooling rate ≥ 1 ℃/min


Temperature range of the inner surface of the heat sink:- 150~+160℃


Uniformity of heat sink temperature: ± 2 ℃


Temperature control precision of temperature control base plate: ± 0.5 ℃


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).


Temperature controlled base plate


1. Temperature control process of thermal oil:


Effective temperature control zone: 1.0X1.2m2 x 2


Temperature range of temperature control base plate:- 75℃~+130℃;


Temperature uniformity of temperature control base plate: ± 2 ℃;


Temperature control precision of temperature control base plate: ± 0.5 ℃


Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;


After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than 30 minutes;


The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).


Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;


3、 Main technical indicators of equipment system (excerpt)


Vacuum degree parameter


1. Internal dimensions of the main heat sink: φ 2m * 4m (length)


2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;


3. The total power consumption of the equipment is expected to be 120kw/380V


Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67


4. Temperature control platform: Thermal oil process;


5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃


6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);


7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);


8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)


9. Vacuum degree time<4h


10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m&sup3/ s;


When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping


The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes


Test piece temperature


13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used


It is recommended to use mechanical refrigeration, which can save a lot of operating costs.


14. Temperature display accuracy: 0.1 ℃;


15. Temperature fluctuation: ≤ ±1℃;


16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃


Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;


Heat sink index (bottom plate index)


1. Gas nitrogen process (external heat flow):


Heat sink heating and cooling rate ≥ 1 ℃/min


Temperature range of the inner surface of the heat sink:- 150~+160℃


Uniformity of heat sink temperature: ± 2 ℃


Temperature control precision of temperature control base plate: ± 0.5 ℃


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).


Temperature controlled base plate


1. Temperature control process of thermal oil:


Effective temperature control zone: 1.0X1.2m2 x 2


Temperature range of temperature control base plate:- 75℃~+130℃;


Temperature uniformity of temperature control base plate: ± 2 ℃;


Temperature control precision of temperature control base plate: ± 0.5 ℃


Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;


After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than 30 minutes;


The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.


2. Liquid nitrogen process:


Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).


Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;


4、 Structure section


1. The test chamber container is designed as a vacuum container and has a horizontal circular cylindrical structure. It is supported by a support frame at the bottom, which directly lands on the ground


2. The vacuum chamber adopts a horizontal stainless steel vacuum container (made of SUS304 stainless steel, with a thickness of 16mm), and the inner side is


Mirror polishing, white spray coating on the outside; The vacuum chamber is equipped with low-pressure lighting, with a brightness of not less than 200 lumens. Vacuum chamber with built-in cargo platform


The platform.


Configure the track inside the tank, and set two parallel guide rails inside the heat sink. The top height of the guide rails is about 60cm below the centerline of the heat sink (safe installation will be carried out in the later stage of development, and the guide rail design will be confirmed by the demand side). The guide rail can bear a load of ≥ 3 tons.


Configure the lifting and unloading vehicle to complete the installation and docking between the test piece (about 3 tons) and the guide rail,


Install separate guide rails and a temperature control platform for each zone. The temperature control platform can be removed or does not affect the entry and exit of the 3-ton test piece.


Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser


Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser


Observation window size: φ300mm, Install one at the center position of the front head of the vacuum container (or according to customer requirements), and install one on one side of the tank perpendicular to the axis direction of the tank to facilitate observation of the situation inside the container during the test


Special aerospace black paint is sprayed on the surface, with a solar absorption coefficient of ≥ 0.90 and a hemispherical emissivity of ≥ 0.90, and it does not peel off within the temperature range of 100K to 150 ℃.


Through holes should be reserved on the cold plate; The loading platform has a pull-out function and can be used for assembling test pieces outside of cabin 54. The vacuum container is a horizontal cylindrical shape;


The vacuum container and internal structural materials are made of 0Gr18Ni9 stainless steel, the external structural components are made of carbon steel, and the outside of the container is treated with spray paint;


The inner wall of the vacuum container is polished (0.8um), and 8 necessary flange holes are opened on the wall (4 on each side), including the inlet and outlet interfaces of the nitrogen packaging system, vacuum pumping interface, vacuum gauge interface, temperature measurement and control interface, inflation interface, and other flanges.



Recommended products

主站蜘蛛池模板: 一边摸一边做爽的免费视频日本 | 亚洲性天堂 | 国内精品写真在线观看 | 蜜臀av性久久久久蜜臀aⅴ涩爱 | 国产欧美精品 | av无码久久久久不卡网站下载 | 中文字幕天天躁日日躁狠狠躁 | av无遮挡| 成人免费看片98欧美 | 国产欧美日韩综合视频专区 | 毛片毛片毛片毛片毛片毛片 | 人妻少妇邻居少妇好多水在线 | 放荡的少妇2欧美版 | 欧美性xxxx极品少妇 | 免费不卡毛片 | 久久亚洲一区二区三区舞蹈 | 黄网在线免费看 | 中日韩毛片| 成人无码精品一区二区三区 | 久久精品9 | avtt香蕉久久 | 天天骑天天干 | 免费高清欧美一区二区三区 | 同性女女黄h片在线播放 | 日本污污网站 | 日韩伦理一区二区 | 久久久ww | 无码专区久久综合久中文字幕 | 欧洲国产精品无码专区影院 | 国产成人无码a区精油按摩 日韩aⅴ片 | 中文在线中文a | 制服丝袜av无码专区完整版 | 国产人妻久久精品一区二区三区 | 国色精品卡一卡2卡3卡4卡在线 | 99久久精品毛片免费播放高潮 | 男人下部进女人下部视频 | 狠狠色噜噜狠狠狠777米奇小说 | 色国产在线| 亚洲国产欧美在线人成 | 美女黄色一级片 | 麻豆精品传媒一二三区 | 91精品综合久久久久久五月天 | 日韩精品你懂的 | 好吊精品 | 欧美激情自拍 | 婷婷国产在线 | 久久人人爽人人爽人人片av不 | 综合精品视频 | 在线a亚洲视频播放在线观看 | www.亚洲色图.com | 特黄熟妇丰满人妻无码 | 性饥渴的少妇av无码影片 | 国产精品100 | 性一交一乱一色一情丿按摩 | 欧美激情三区 | √天堂资源地址中文在线 | 精品国产乱码久久久久久蜜退臀 | 大肉大捧一进一出好爽视频mba | 精品国产乱码久久久久久老虎 | 亚洲精品福利视频 | 国产超碰人人做人人爱一二区视品 | 在线 | 18精品免费1区2 | 婷婷久久久久久 | 国产精品伦理久久久久 | 91精品国产色综合久久不8 | 国产免费破外女真实出血视频 | 99热免费在线观看 | 日本人妻中文字幕乱码系列 | hodv一21134铃原爱蜜莉在线 | 亚洲第一页在线观看 | 91欧美精品午夜性色福利在线 | 天天燥日日燥 | 精品国产乱码一区二区三区99 | 久久久久久久香蕉国产30分钟 | 无码中文字幕av免费放dvd | 亚洲乱码国产乱码精品精98午夜 | 美女bbbbb免费视频 | 国产白丝精品91爽爽久久 | 午夜成人免费视频 | 夜夜夜操操操 | 国产在线综合视频 | aaaaa爽爽爽久久久 | 91麻豆国产 | 日本一区二区三区精品福利视频 | 无码人妻精一区二区三区 | 亚洲淫视频 | 国模雨珍浓密毛大尺度150p | 国产超爽人人爽人人做人人爽 | 精品国产不卡一区二区三区 | 美女黄网站人色视频免费国产 | 欧美乱论视频 | 国产成人av性色在线影院色戒 | 欧美乱妇高清无乱码一级特黄 | 人妻少妇精品无码专区漫画 | 国产精品久久久久久无毒不卡 | 青青草原综合久久大伊人精品 | 男女床上拍拍拍 | av+在线播放在线播放 | 五月天婷婷在线视频精品播放 |