三级网看小美女I97韩国电影I久久伊人操I国产91学生I亚洲成色777777在线观看影院I欧美俄罗斯性视频I波多野结衣久久久I欧美日韩国产免费视频I国产精品久久久久9999吃药

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Ice simulation system

  • Hot Line:18322499311

結冰模擬系統.png



Performance indicators and components of icing simulation system

1. Overall system composition

Ice simulation system

It includes spray system, flight speed simulation system and electrical system.

Spray system


Produce frozen clouds and mist with a certain diameter and content of liquid water.

Flight speed simulation system

Simulating icing test by driving a fan to generate a certain flow of circulating air


Flight Mach number, after the icing cloud is ejected from the spray system and the flight speed simulation system


The generated circulating air is blown towards the specimen together.


electrical system


Control the electrical components in the spray system and flight speed simulation system.


The spray system, flight speed simulation system and electrical system are arranged in the test room.


All testing and control signals communicate with the control system in the control room through the network.


2. Main technical indicators


According to the typical icing state points of the test piece, the main technical indicators of the icing simulation system are as follows:


1. Maximum circulating air flow rate: ≥ 200kg/s (including 25kg/s of gas supply);


2. Boosting ability of the driving fan: ≥ 10kPa (ground atmospheric pressure);


3. Maximum diameter of the inlet nozzle in the experimental section: 1.3m;


4. Maximum flow velocity of the test section nozzle: 80m/s;


5. Liquid water content of spray (LWC): (0.2~3) g/m 3;


6. Average diameter of spray droplets (MVD): (15 ~ 55) μ m;


7. Control accuracy of liquid water content: ± 10%;


8. Control accuracy of average diameter of water droplets: ± 5um;


9. Uneven cloud and mist: ≤ ± 20%.


3. Following standards


The standards and specifications that system manufacturing should follow:


1. Design Specification for Aircraft Engine Test Stand (GB 50454-2008);


2. Industrial Enterprise Boundary Noise Standard (GB 12348-2008);


3. Design Code for Industrial Metallic Piping (GB 50316-2000);


4. Code for Construction and Acceptance of Industrial Metal Pipeline Engineering (GB 50235-2010);


5. Design Code for Integrated Cabling System Engineering (GB 50311-2016);


6. Code for Design of Low Voltage Power Distribution (GB 50054-2011);


7. Design Code for Distribution of General Electrical Equipment (GB 50055-2011);


8. Design and Verification Criteria for Wind Tunnel Control Systems (GJB 5221-2004);


9. Quality Specification for Flow Fields in High Speed Wind Tunnels and Low Speed Wind Tunnels (GJB 1179A-2012);


10. Non destructive Testing of Pressure Equipment JB/T 4730-2005;


11. Stainless Steel Welded Steel Pipes for Fluid Transport GB/T 12771;


12. "Convex Welding Steel Pipe Flanges" GB/T 9115-2010;


13. "Metal coated gaskets for pipe flanges" GB/T 15601-2013;


14. Saddle Support JB/T 4712.


4. Usage environment and conditions


1. Working medium: air and low-temperature air;


2. Environmental temperature range: -35 ℃ to room temperature;


3. Working pressure of the test section: (35-130) kPa (absolute pressure);


4. Environmental humidity: Maximum 100% RH, working in a liquid water environment for a long time;


5. Installation conditions: Indoor, temperature range 0-35 ℃;


6. Power supply conditions: Three circuits of high voltage 10kV power supply, with powers of 1500kW, 1440kW, and 1440kW respectively; Low voltage power supply


380V, 7. Total power 1600kW, distribution cabinet configured with 1000kW, 800kW, 400kW, 250kW, 100kW and


Six circuits, including 50kW, with a frequency of 50Hz ± 2%;


8. Cooling circulating water conditions: Two supply and return water interfaces have been reserved, both of which are DN300, with a total circulating water flow rate of not less than 500t/h.


5 spray system


Main components of spray system


Including water supply subsystem, atomizing air subsystem, control subsystem, spray device (section)


Carrying platform, testing equipment, etc.


Water supply subsystem


Function: to provide pure water for the spray section. The water source of the water supply system is connected to tap water, through coarse filtration and fine filtration


Desalination, ionization and other treatments are carried out to reduce the electrical resistivity of water to above 10M Ω· cm, and a load-bearing platform is arranged.


Principle: The tap water provided by Party A is purified by a pure water machine and stored in a water tank


Pure water is pressurized by a pipeline pump, and the water supply flow and pressure are adjusted by an electric regulating valve. The pipeline is equipped with


Buffer stabilizing device to maintain stable water supply pressure; To ensure that the nozzle is not blocked or frozen, it has a heating temperature


Ability.


Functional parameters:


1. Purified pure water has a resistivity of over 10M Ω· cm and no hardness;


2. The single spray time is ≥ 76min, the water capacity of the pure water machine is 0.5t/h, the volume of the water tank is 2000L, and the water tank is equipped with a level gauge;


3. The water supply pressure should be adjustable within the range of (0.1-0.5) MPa;


4. Ability to heat up to a temperature rise of ≥ 30 ℃ at maximum pure water flow rate;


5. Be able to measure the water flow, temperature and pressure supplied to the spray section.


Function: provide atomizing air for the spray system, and blow dry the pipeline and nozzle after the spray stops. The simulated environment icing device simulates the icing conditions by atomizing gas and water in a gas-liquid two-phase nozzle in a natural low-temperature environment. In order to prevent liquid from freezing in low-temperature pipelines or nozzles and avoid damage to the test object after ice falls off, heated water and air are required to be arranged on the bearing platform.


Principle: Connect the ambient temperature compressed air provided by Party A to the atomization air subsystem, adjust the flow and pressure of the compressed air through an electric valve, and install a filter to ensure clean output air.





Recommended products

主站蜘蛛池模板: 国产欧洲精品自在自线官方 | 黄色字幕网 | 老色鬼a∨在线视频在线观看 | 天天射天天射 | 麻豆精品在线观看 | 97精品免费视频 | 国产精品久久777777毛茸茸 | 中文无码一区二区三区在线观看 | 国产一级片麻豆 | 一区二区人妻无码欧美 | 视频一区中文字幕 | 狂野欧美性猛xxxx乱大交 | 欧美野外做受又粗又硬 | 久久婷婷国产综合国色天香 | 91popny丨九色丨国产 | 欧美不卡在线视频 | 风韵犹存的岳的呻吟在线播放 | snis839痴汉明日花キララ | 色欲香天天天综合网站无码 | 内射白浆一区二区在线观看 | 国产成人a人亚洲精v品无码 | 欧美一级视频免费观看 | 国产精品一区二区av不卡 | 成人午夜大片 | 熟妇激情内射com | 国产精品色网 | 国产农村妇女野外牲交视频 | 黑人巨大人精品欧美三区 | 免费一级做a爰片蜜桃 | 中文字幕人妻高清乱码 | 国产美a三级三级看三级 | 国产a∨国片精品白丝美女视频 | 一级黄色特级片 | 尤物99国产成人精品视频 | 少妇人妻呻吟青椒bobx | 狠狠色丁香久久婷婷综合蜜芽五月 | 欧美一区二区三区在线观看视频 | hd最新国产人妖ts视频 | 国产精品视频一区二区噜噜 | 伊人久久大香线蕉av五月天 | 你懂的在线观看网址 | 日韩亚射吧 | 亚洲人成无码网站 | 情侣呻吟对白精品av | 国产福利视频一区二区在线 | 久久久精品中文字幕 | 亚洲精品国产自在久久 | 香蕉视频在线精品视频 | 欧洲hdxxxx女同av性恋 | 国产女人喷浆抽搐高潮视频 | 国产裸体美女视频全黄扒开 | a v 在线视频 亚洲免费 | 真人第一次毛片 | 欧美大尺度床戏做爰 | 中文字幕超清在线免费 | 91亚洲在线 | 成人性生交大片免费看 | 国产经典盗摄91区x99av | 国产精品乱码久久久久久小说 | 天天躁久久躁日日躁 | 2024国产精品 | 久久成人综合 | 国产成人精品一区二区色戒 | 影音先锋人妻av在线电影 | 波多野结衣网址 | 成人精品鲁一区一区二区 | h片免费在线观看 | 成人精品国产区在线观看 | 精品国产乱码久久久久久鸭王1 | 欧美3p两根一起进高清视频 | 一级做a爰片欧美激情床 | 日韩欧美在线一级 | 久久94| 五月激情综合网 | 欧洲av片| 精品国偷自产国产一区 | 色综合伊人色综合网站无码 | 高潮又爽又黄又无遮挡动态图 | 高清一区二区三区免费视频 | 精品国产乱码一区二区 | 亚洲性夜夜摸人人天天 | 国产精品成人免费视频 | 91亚洲精品国产成人 | 青青青青久久精品国产 | 日啪| 国产一区二区三区观看 | 日本在线视频免费 | 麻豆天天躁天天揉揉av | 亚洲欧洲日韩av在线观看 | 国产韩国精品一区二区三区久久 | 亚洲天堂一区二区三区 | 麻豆视频在线观看免费网站黄 | 一个色的综合 | 精品视频区 | 美女张开腿喷水高潮 | 在办公室被c到呻吟的动态图 | 天天干夜夜玩 | 亚洲成人网在线 | 国产91打白嫩光屁屁网站 |